One of our clients in Vietnam needed a range of our IHS Stressing Equipment for their project. Included in this order was custom designed hydraulic noses to suit their specific strand pattern. This system enables positive wedge seating which reduces the amount of strand tension loss. Check out the video below. Equipment Supplied
Two custom made hot water units completed and ready for delivery. Specifications
McMillan Engineering Group has supplied two Transfer Beams for the Level Crossing Removal Project in Murrumbeena. The transfer beams are installed as a protection deck over the rail below. Both the elevated rail spans and the main carrier are transferred over the top of the transfer beams. Transfer Beam Details
Synchronised Lift System
A completed custom WCB Acid Tank completed to the clients unique specifications. Custom Tank Details
Tilt Table Cylinders assembled, tested and painted ready for delivery. McMillan Engineering Group designed these cylinders to suit a very specific application with variable forces and limited space taken into consideration. Cylinder Details
This purpose built test bench was engineered to meet the clients exact requirements. McMillan Engineering Group manufactured, assembled, delivered and commissioned the unit.
Designed to with two PSV test stations to suit ANSI flange valves and 3/4" NPT Valves, with a maximum test pressure of 12,500kPa. The test bench incorporates the following features.
This tank was custom designed and manufactured to meet the clients specific requirements. Features
Features
The Port Miami Tunnel Project formed two 1.2km, 2 lane tunnels to form an alternative link to Dodge Island via the MacArthur Causeway on Watson Island. McMillan Engineering Group supplied eight 300T double acting safe rams to facilitate the lifting of the 13.1m diameter tunnel boring machines. Via the use of internal porting we were able to design these rams with 150mm stroke and only 430mm closed height. Specifications
McMillan Engineering Group were contracted to design, manufacture and supply a wide range of custom cylinders, power units and hydraulic accessories for the Urban Superway Project in Adelaide, South Australia. Cylinder Details
Pump Details
Hydraulic Accessories
Features
McMillan Engineering Group, then trading as Industrial Hydraulic Services were responsible for the complete design, manufacture and supply of the 20T Mooring Winch System, 30T Double Drum Derricking Winch System, 420T Luffing Cylinders and the 700HP Hydraulic Power Unit. Details: 30T Double Drum Derricking Winch System
20T Mooring Winch System
Luffing Cylinders
Hydraulic Power Unit
The Australian National Construction Review featured this project in their magazine. Click on the button below to download an extract. Once this project was completed the system was redeployed to dismantle the old berth wall next to Sydney Ports’ Marine Operations Centre at Moore’s Wharf. Click here to go to the Port Authority of NSW website for more details. Custom designed and manufactured to meet our customers specific needs. Not only did we manufacture this Launch System Power Unit, we also refurbished the customers existing Launch Cylinders, fitted rotary transducers and pilot operated check valves. Custom HPU Features
Lift Cylinder Refurbishment
Custom designed pressure vessel with press cylinder incorporated. Also included a split system hydraulic power unit, Intensifier and Tie Rod Tension Cylinder. Pressure Vessel
Hydraulic Power Unit
Intensifier
Press Cylinder
Tie Rod Tension Cylinder
McMillan Engineering Group designed & manufactured this complete Stress Bed System to meet the customers unique specifications. To increase the efficiency of the system the client requested that the lock rings for the double acting safe rams be mechanically operated. This allowed the client to operate the system without having to have an operator manually lock off the rams for each stress.
Features
Hydraulic Stress Bed * Photos courtesy Leighton Abigroup Joint Venture |
Archives
September 2017
|