McMillan Engineering Group, then trading as Industrial Hydraulic Services designed, manufactured and supplied span jacks for the M7 Project in Sydney, NSW. Details: 16 x 200T Span Jacks
24 x IHS-0125-05-LR-SR
550T Stressing Equipment, 5 x 5.5kW Power units, Anchor Blocks, Trumpets, Battery Sets & Bearing Plates 550T Stressing Equipment, 5 x 5.5kW Power units, Anchor Blocks, Trumpets, Battery Sets & Bearing Plates 500T Stress bed consisting of two 350T, 250mm stroke double acting safe rams and a 5.5kW Split Flow Power Unit. Designed with the ability to be upgraded to a 700T Stress Bed. Delivery ready for one of our pre-stressing customers. Custom designed and manufactured to meet their specific requirements. Custom IHS-CH-0630-08-DA
Custom Hydraulic Power Unit
The Bai Chay Bridge connects Hong Gai with Bai Chay over the Cua Luc Straits. Industrial Hydraulic Services designed, manufactured and supplied a large range of hydraulic equipment for the Form Travellers used on this project.
Features
McMillan Engineering Group (trading as Industrial Hydraulic Services) supplied forty 200T Span Jacks & Two Power Units for this project. McMillan Engineering Group (trading as Industrial Hydraulic Services) supplied sixteen 110T, 150mm stroke load return safe rams for this project. Designed and manufactured two Heating & Cooling Platen Presses, Power Unit & Control System. In 1999 a development was planned for the historically significant Wales House building in Sydney. An extra floor was required which meant the 915T cupola needed to be raised 3.9m. Since dismantling the cupola was nut possible the decision was made to raise the cupola via the use of hydraulics. The cupola was raised and supported 1.3m a night over three nights. McMillan Engineering Group designed and manufactured 12 hydraulic cylinders, a hydraulic power unit and a control panel to achieve this engineering feat. Cylinder Details
Hydraulic Power Unit Details
Control Panel Details
McMillan Engineering Group (trading as Industrial Hydraulic Services) supplied 150T, 180T, 185T & 300T Jacks and Power Units for this project. The My Thuan bridge is a cable stay bridge over the Mekong River in Vietnam. McMillan Engineering Group designed, manufactured and supplied heavy lift equipment to raise the super tee girders. The bridge spans over 1.5km and with 37m clearance. Heavy Lift Cylinders
Traversing Cylinders
Hydraulic Power Unit
Control Panel
McMillan Engineering Group (trading as Industrial Hydraulic Services) supplied a range of hydraulic equipment for this project. McMillan Engineering Group (trading as Industrial Hydraulic Services) supplied a 800T Jacking System comprising of 100T jacks. McMillan Engineering Group (trading as Industrial Hydraulic Services) supplied a 3,000T Jacking System which included the 300 Tonne, 1200mm stroke hydraulic cylinder shown. McMillan Engineering Group (trading as Industrial Hydraulic Services) supplied a 30T Launching Jacks. McMillan Engineering Group (trading as Industrial Hydraulic Services) supplied a range of hydraulic equipment for this project. |
Categories
All
Archives
September 2017
|